Hangar Assembly Manual
Select a section title to view the associated PDF document
Introduction (67k)
Tools Required (77k)
Workstation (80k)
Hangar Site Selection/Tail And Wing Post Location (72k)
Figure 1 Hangar Perimeter Clearance (19k)
Figure 2 Hangar Footprint Dimensions (19k)
Figure 3 Tail And Wing Post Location (20k)
Setting The Tail And Wing Anchors (338k)
Setting The Tail And Wing Posts (185k)
Assembling The Wing And Tail Trusses/Painting the Truss (332k)
Setting The Tail And Wing Trusses On The Posts (337k)
Setting Up The Wall Panels (732k)
Wall Panels To Truss Attachment (263k)
Installing Anchor Stakes (208k)
Installing Electrical System (280k)
Forming and Cutting The Tail House To Wing House Corner Paneling (121k)
Installing the Closure Stripping (274k)
Installing Siding/Installing the Winghouse Trailing Edge Siding (145k)
Installing Wingtip Siding (132k)
Installing the Tailhouse Siding (425k)
Wooden Wheel Channel (161k)
Gravel Floor (166k)
Installing Panel 1 and 2 On Tailhouse (160k)
Installing Tailhouse Roof (477k)
Installing the Roof on Winghouses (447k)
Installing Hinged Nose Door Panel (183k)
Installing Hinged Wing Door Panels (372k)
Attaching the Nosehouse (391k)
Cutting and Forming the Nose Hinge/Nosehouse Corner Pieces (72k)
Cutting the Four 10’ Corner Pieces (219k)
Installing Siding on Nosehouse and Center Hinge Panel/Covering the Winghouse Doors (408k)
Winch Cable Hookup (151k)
Test and Adjust the Nosehouse Door (354k)
Attaching the Wingdoor Draglinks (282k)
Attaching the Corner Pieces (146k)
Installing Fascia (218k)
Installing Carpeting (150k)